Beijing Huayuan Thai Union Energy Saving Equipment Co.,Ltd.

Contact us

Contact Us

Tel:010-62701509
 010-82432231
Fax:010-62704977
Add:Yousheng Building C, 10-story, on the 20th of Chengfu Road, Haidian District, Beijing.

HYTM successfully held” theSpread MeetingoftheNew Technology Innovation of Datong Heating”

2015-01-30 532 Share
From January 14th to 16th 2015, HYTM Energy-saving Equipment Co. Ltd in Beijing held”theSpread Meeting ofthe New Technology Innovation of Datong Heating” at Datong and organized the representatives to visit the first surplus heat recovery unit in Yungang Power plantand two typical second-class thermal station. The conference invited more than 100 representatives from all class including relevant leaders, experts, heat-supply enterprises and media.

Li Zengqun, the general manager of Yantai MOON Group Co. Ltd, the chairman of Yantai MOON Co. Ltd, went to the meeting and made the summary speech. Wang Qinbo, the vice general manager of Yantai MOON Co. Ltd and the general manager of HYTM shared the report A district heating system with Co-generation based on absorption heat-exchangewhich explained the background, the history of its development and the technology advantage of HYTM and it got large mount of affirmation and recognition.
As the pioneer, implementor and pace-marker in this field, from 2010 to 2013, HYTM has undertaken the surplus heat recovery reconstruction to the first heat and power plant of Datong, Huadian, Yungang Heat and Power Co. Ltd of Datang International and four heat and power plants of Heat and Power Co. Ltd of Coal of Datongin the first and second periods. During the reconstruction, we have installed about 200 absorption heat-exchange units and about 100 thermal stations with large water temperature difference that took place of the boilers. The surplus heat recycled is 1093MW. The heating acreage increased is 24,280,000 square meters. The coal saved per year is 677,000 tons. The CO2 emission reduced is 1,690,000 tons. The emission of SO2 is 51,000 tons. The emission of NOX is 25,000 tons. The emission of smoke is 462,000 tons. The data means 44,000 mu’s trees planted.
Datong, whose air quality was listed the worst 3, after 4 years’ construction, has had blue sky and white clouds again. Datong has been a good example in the field of heating energy saving and the quality of people’s life there has been improved a lot.